HMO Licensing in England: Mandatory, Additional or Selective — Which Applies to Your Property?
Law checked against our records on 29 Oct 2026
England's three property licensing schemes side by side: what each covers, how to check which applies at your postcode, the standard HMO test, and what happens without a licence.
England has three licensing schemes for private landlords, and they are regularly described as one. They are not. One is national and about HMOs, one is local and about HMOs, and one is local and not limited to HMOs at all. This guide sets out what each one covers, how to find out which applies at your postcode, and what happens if a licence is needed and you do not have one.
England only; Wales and Scotland have their own rules. Checked against legislation.gov.uk and GOV.UK; the tests and penalties are correct as at 22 October 2026.
The three schemes side by side
| Mandatory HMO licensing | Additional HMO licensing | Selective licensing | |
|---|---|---|---|
| Where the law is | Housing Act 2004 s.55, with SI 2018/221 article 4 | Housing Act 2004 s.56 | Housing Act 2004 s.80 (Part 3) |
| Where it applies | Everywhere in England | Only where the council has designated an area | Only where the council has designated an area |
| What it covers | An HMO occupied by five or more persons, living in two or more separate households | HMOs of the description the council sets in its designation, which can be all HMOs in the area | Privately rented houses in the area, let under a tenancy or licence; not limited to HMOs |
| Who switches it on | No one: it is national law | Your council, by designation | Your council, by designation |
A property never needs both an HMO licence and a selective licence: if it needs a mandatory or additional HMO licence, it does not also need a selective one (see how the schemes interact).
First: is it an HMO? The standard test
Both HMO schemes start from the definition of an HMO in section 254 of the Housing Act 2004. Most shared houses meet it through the standard test. In plain words, a house or part of a house meets the standard test if:
- the living accommodation in it is not a self-contained flat;
- the people living there do not form a single household;
- they live there as their only or main residence; and
- they share a basic amenity, such as a kitchen, bathroom or toilet, or the accommodation lacks one.
"Household" is about family, not about how many tenancy agreements there are. People form a single household only if they are members of the same family: a couple, or relatives such as parents, children, brothers and sisters, grandparents, uncles, aunts, nephews, nieces and cousins (s.258). So four unrelated sharers on one joint tenancy are four households.
Section 254 itself counts no heads. Schedule 14 to the Act lists buildings that are not HMOs, and one of them is a building occupied only by two persons who form two households. That exclusion applies for licensing and every other purpose of the Act except the housing health and safety rating system in Part 1.
There are other routes into the definition: the self-contained flat test, the converted building test, and a declaration by the council. The HMO licence guide covers each of them.
Mandatory licensing: the national HMO scheme
Mandatory licensing applies everywhere in England. Under Housing Act 2004 s.55(2)(a) and the Licensing of Houses in Multiple Occupation (Prescribed Description) (England) Order 2018, article 4, an HMO needs a licence if it:
- is occupied by five or more persons;
- is occupied by persons living in two or more separate households; and
- meets the standard test, the self-contained flat test (except a purpose-built flat in a block of three or more self-contained flats) or the converted building test in s.254.
That five-person figure is a licensing threshold, not the definition of an HMO. The old three-storey requirement went with the order that SI 2018/221 revoked, and has not applied since 1 October 2018.
Additional licensing: a local HMO scheme
A council can widen HMO licensing in its own area. Under s.56, it may designate all or part of its district as subject to additional licensing for a description of HMOs it specifies in the designation. That description can cover all HMOs in the area (s.56(4)).
Before designating, the council must:
- consider that a significant proportion of the HMOs of that description in the area are being managed sufficiently ineffectively as to give rise, or to be likely to give rise, to problems for the occupiers or for members of the public (s.56(2));
- consult, and consider the representations made (s.56(3)).
In practice, additional licensing is how an HMO with fewer than five occupiers can still need a licence. Whether it does depends entirely on whether your council has a designation in force, and what description of HMO it covers.
Selective licensing: a local scheme that is not about HMOs
Selective licensing is in a different Part of the Act, Part 3. Under s.80, a council may designate all or part of its district for selective licensing where one of two sets of conditions is met:
- the area is, or is likely to become, an area of low housing demand; or
- the area has a significant and persistent problem caused by anti-social behaviour, and private landlords are failing to take appropriate action to combat it.
Part 3 applies to a house in the designated area that is occupied under a tenancy or licence, or under two or more tenancies or licences of different dwellings in it (s.79(2)). So a house let to one family can need a selective licence, and can never need an HMO licence.
How the schemes interact
They do not stack. Under s.85(1)(a), a house does not need a selective licence if it is an HMO to which Part 2 applies, meaning an HMO that needs a mandatory or additional licence. That HMO is licensed under Part 2 instead.
| Your property | Scheme it may need |
|---|---|
| An HMO meeting the five-person, two-household test | Mandatory HMO licence, anywhere in England |
| A smaller HMO in an additional licensing area that covers its description | Additional HMO licence |
| A rented home in a selective licensing area, not needing an HMO licence | Selective licence |
The table describes the law. It cannot tell you which local designations are in force where your property is. Only your council can.
How to find out what applies at your postcode
There is no national register of designations and no single list of which councils run which schemes. Three steps:
- Find your council. GOV.UK's HMO licence page has a postcode search that takes you to your council. It also says, in its own words, that even a smaller property rented to fewer people may still need a licence depending on the area.
- Read the council's licensing page. Look for any additional or selective licensing designation, the area it covers, and, for additional licensing, the description of HMO it applies to. Many councils publish a map of their designated areas or a street list; check that your address is inside the boundary, not just near it, and that the designation is in force on the date you let.
- Ask in writing if it is unclear. If the property is on a boundary or does not fit the description neatly, email the council's licensing team. Keep the reply with its date: it is your record of what you were told, and when.
A licence lasts for the period the council sets, which must not end more than five years after it is granted. The council also sets the fee and the application process. A licence may not be transferred to another person, so if you are buying a licensed HMO, ask the council what it needs from you before completion.
To see the licence fee alongside the conversion cost and the rent, enter your council's fee in our free HMO conversion calculator.
Licence conditions worth knowing before you apply
A licence is granted with conditions, and some are set by the Act rather than by the council. Every licence, HMO or selective, must include conditions requiring the licence holder to produce a gas safety certificate to the council each year if gas is supplied, to keep smoke alarms on each storey with living accommodation and carbon monoxide alarms in rooms with a fixed combustion appliance other than a gas cooker in working order, and to give occupiers a written statement of the terms on which they occupy.
An HMO licence in England must also set minimum sleeping-room sizes: 6.51 m² for one person aged over 10, 10.22 m² for two people aged over 10, and 4.64 m² for one child under 10. A room smaller than 4.64 m² must not be used for sleeping at all. The licence also sets the maximum number of people who may sleep in each room. Measure before you apply: floor area under a ceiling lower than 1.5 metres does not count. Our guide to HMO room sizes and licence conditions explains how they are measured and how long you have to fix a room that falls short.
If a licence is needed and you do not have one
Managing or controlling an HMO that needs a licence and does not have one is an offence under s.72(1). Since 1 May 2026 it can be committed by a superior landlord as well. On conviction the penalty is a fine. The equivalent offence for a house that needs a selective licence is in s.95.
Both are relevant housing offences, so the council can impose a civil penalty of up to £40,000 instead of prosecuting (s.249A, since 1 May 2026).
Either offence can also lead to a rent repayment order. For these offences the order can cover a period of not more than 2 years during which the landlord was committing the offence (Housing and Planning Act 2016 s.44, since 1 May 2026). A tenant can apply if the offence was committed in the 2 years before the day they apply (s.41(2), since 1 May 2026).
Correct as at 22 October 2026.
Keeping track of a licence
A licence has an expiry date, and the licensing answer itself can change if your council introduces or ends a designation. The free tracker puts the HMO licence on each property's checklist alongside the certificates, from a few answers about the property. In the LetSorted app, you record what your council told you about licensing, keep the licence document, and get a reminder before it expires: see how LetSorted handles HMOs. Neither decides whether a licence is needed; your council does.
Once the licence is sorted, the day-to-day duties come from elsewhere: the HMO management regulations, duty by duty, and, if you let by the room, deposits, rent and notice for each room tenancy.
Frequently Asked Questions
What is the difference between mandatory, additional and selective licensing?
Mandatory licensing applies everywhere in England to an HMO occupied by five or more persons living in two or more separate households (Housing Act 2004 s.55 and SI 2018/221 art.4). Additional licensing is a local scheme: a council designates an area so that HMOs of a description it chooses need a licence too (s.56). Selective licensing is a local scheme for privately rented homes in a designated area and is not limited to HMOs (ss.79–80). An HMO that needs a mandatory or additional licence is licensed under that scheme, not the selective one (s.85(1)(a)). Correct as at 22 October 2026.
Can a single-family let need a licence?
Yes. A house let to one family can never need an HMO licence, but it can need a selective licence if the council has designated its area for selective licensing (Housing Act 2004 ss.79–80). Correct as at 13 October 2026.
How do I find out whether my area has a licensing scheme?
Ask your council. There is no national register. GOV.UK's HMO licence page has a postcode search that takes you to your council's licensing pages, and says that even a smaller property rented to fewer people may need a licence depending on the area.
What happens if I let a property that needs a licence without one?
Managing or controlling an HMO that needs a licence and is not licensed is an offence under Housing Act 2004 s.72(1), punishable on conviction by a fine. Instead of prosecuting, the council can impose a civil penalty of up to £40,000 (s.249A). A rent repayment order can also cover a period of up to 2 years during which the offence was being committed (Housing and Planning Act 2016 s.44). Correct as at 22 October 2026.
How long does a property licence last?
No more than five years. The council sets the period when it grants the licence, and the period must not end more than five years after the grant (Housing Act 2004 s.68 for an HMO licence, s.91 for a selective licence). A licence cannot be transferred to another person.
This guide is for informational purposes only and does not constitute legal advice. Laws and regulations may change — always verify current requirements and consult a qualified solicitor for advice specific to your situation.
Found this useful? Share with other landlords: